A complete integral treatment process, supplied in GRP cylindrical tank available in a variety of sizes to treat a population equivalent (PE) of between 30 and 250.
Overview
The complete treatment process includes three stages of operation, including:
- Stage 1: Screening and grit removal; sludge storage; primary settlement;
- Stage 2: SAF stage for aerobic fixed film biological treatment;
- Stage 3: Humus settlement stage with air lift return to septic tank.
Integral BioSAF Units sizes for 20:30 (BOD5:TSS)
PE |
BOD (kg/d) |
Models |
Size(m): Diam x L |
---|---|---|---|
25 |
1.5 |
BioSAF-S7 |
1.8x7 |
35 |
2.1 |
BioSAF-S10 |
1.8x10 |
45 |
2.7 |
BioSAF-S11 |
1.8x11 |
55 |
3.3 |
BioSAF-M9 |
2.3x9 |
65 |
3.9 |
BioSAF-M10 |
2.3x10 |
75 |
4.5 |
BioSAF-L9 |
2.6x9 |
85 |
5.1 |
BioSAF-L10 |
2.6x10 |
95 |
5.7 |
BioSAF-L12 |
2.6x12 |
105 |
6.3 |
BioSAF-L13 |
2.6x13 |
115 |
6.9 |
BioSAF-L14 |
2.6x14 |
125 |
7.5 |
P8 + BioSAF-L7 |
2.6x8 + 2.6x7 |
135 |
8.1 |
P9 + BioSAF-L8 |
2.6x9 + 2.6x8 |
145 |
8.7 |
P9 + BioSAF-L8 |
2.6x9 + 2.6x8 |
155 |
9.3 |
P10 + BioSAF-L9 |
2.6x10 + 2.6x9 |
165 |
9.9 |
P11 + BioSAF-L9 |
2.6x11 + 2.6x9 |
175 |
10.5 |
P11 + BioSAF-L9 |
2.6x11 + 2.6x9 |
185 |
11.1 |
P12 + BioSAF-L10 |
2.6x12 + 2.6x10 |
195 |
11.7 |
P12 + BioSAF-L10 |
2.6x12 + 2.6x10 |
205 |
12.3 |
P13 + BioSAF-L11 |
2.6x13 + 2.6x11 |