Case Studies

Business case
Removal of thiosalts from wastewater at remote mine site
Business case
The client urgently needed to remove 200,000 m3 – 300,000 m3 of water from tailings pit in 3 months
Business case
The smart membranes tool of Hubgrade has been in operation since September 2020 on Oman Sur Desalination plant.
Business case
Hubgrade Performance (formerly known as AQUAVISTA™ Plant) was first installed in 2007 at the Agtrup WWTP.
Business case
Veolia Water Technologies was contracted by Sydney Water Corporation to design, build and provide operational advice for upgrading 3 wastewater treatment plants south of Sydney.
Business case
Veolia Water Solutions & Technologies was awarded the contract for the design and build of the Kwinana Water Reclamation Plant.
Business case
Veolia Water Technologies was awarded the contract for the design & build of the upgrade of Brampton Island Sewage Treatment Plant.
Business case
Macquarie Generation awarded Veolia Water Technologies with a contract for upgrading the Bayswater water treatment plants.
Business case
Veolia Water Technologies was awarded contracts for the design and supply of the Effluent Treatment Package & for the demineralisation plant for the Pluto Onshore LNG Plant.